Kurzstreckenlaufbahn © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Ansicht Sporthalle © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Sitzstufen © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Detail Stehstufenanlage © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Kunstrasen © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Hortensien und Fußball? © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Freizeitsport willkommen © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Kurzstreckenlaufbahn mit Großspielfeld © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Perspektive 100m-Laufbahn, Entwurfsplanung © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Gesamtperspektive Entwurf © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Gesamtperspektive Entwurf © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Perspektive Stufenanlage, Entwurfsplanung © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
Perspektive Stufenanlage, Entwurfsplanung © 2010 Joachim Schulze pslandschaft.de - freiraumplanung
				The renovation of the facility included the revision of the large playing field, the running track, the long jump facility and the walkways with the accompanying lawns. The work was carried out after completion of the new sports hall built by the building management of the city of Langenfeld.
The sports facility serves the HSV Langenfeld as an additional training facility and as a venue for point games in girls' and women's soccer. Furthermore, it provides the adjacent schools and the inner-city residential area with differentiated usable outdoor sports areas. Unfortunately, public use as intended by the developer is not a matter of course with many newly built artificial turf pitches.
								The existing turf surface was in need of major renovation and was replaced with an artificial turf surface filled with sand and rubber granules.
The sprint track had to be reduced by one running lane because of the obstacle-free spaces. The remaining three lanes received a new Type D waterproof synthetic surface. The sprint track also serves as a run-up track for the new long jump pit.
The awkwardly located standing steps along half of the eastern long side were dismantled and replaced by a seating wall.
The existing drainage facilities of the sports areas into the adjacent stream were dismantled or taken up and now drain into a trough-rigol system.							
Read more +
Planning offices
								
									pslandschaft.de - open space planning					
								
								
				
				Köln				
			
				Employees
				
				Joachim Schulze
Christian Marx
Erik Steinhauer			
				Project period
				
				2009 
				 - 				2010			
				Size
				
				ca. 7.000 m2 
			
				Construction amount
				
				452.000,- € 
			
				Client
				
				Stadt Langenfeld
Gebäudemanagement
Konrad-Adenauer-Platz 1
D-40764 Langenfeld				
				
							
			
				Address
				
				Hinter den Gärten 				
				40764 Langenfeld				
				Deutschland 				
			
Show project location on map
				Project type
								
				Playgrounds, e.g. at childcare centers and schools
								
				Sports facilities