Outdoor facilities Mahlsdorf elementary school Redesign of the schoolyard of an elementary school

Planning process

The new gymnasium building and the existing mobile classrooms were integrated into the outdoor space and combined into a unified image. In the design, care was taken to preserve the numerous woody plants, such as trees and shrubs, as far as possible. An "island concept" was planned, in which the existing trees were integrated. Furthermore, different areas of use and play have been created on the "islands". The inner area is framed by a stringent planning, which visually summarizes the island concept. Parts of the adjacent areas in the S/W and N/W of the old school building remained largely untouched.

Skizzen zum Vorentwurf – Variante A ©  hochC Landschaftsarchitekten PartGmbB

1 / 6

Skizzen zum Vorentwurf – Variante B ©  hochC Landschaftsarchitekten PartGmbB

2 / 6

Skizzen zum Vorentwurf – Variante C ©  hochC Landschaftsarchitekten PartGmbB

3 / 6

Vorentwurfsplan ©  hochC Landschaftsarchitekten PartGmbB

4 / 6

Entwurfsplan ©  hochC Landschaftsarchitekten PartGmbB

5 / 6

Ausführungsplan ©  hochC Landschaftsarchitekten PartGmbB

6 / 6

Skizzen zum Vorentwurf – Variante A ©  hochC Landschaftsarchitekten PartGmbB

Skizzen zum Vorentwurf – Variante B ©  hochC Landschaftsarchitekten PartGmbB

Skizzen zum Vorentwurf – Variante C ©  hochC Landschaftsarchitekten PartGmbB

Vorentwurfsplan ©  hochC Landschaftsarchitekten PartGmbB

Entwurfsplan ©  hochC Landschaftsarchitekten PartGmbB

Ausführungsplan ©  hochC Landschaftsarchitekten PartGmbB

Student Workshop

In the course of the preliminary design, a workshop was held with students of Mahlsdorf Elementary School, as well as representatives of the school, the after-school care center, and the district office. After an inspection of the playground, ideas, wishes and suggestions for the redesign of the schoolyard were collected together.

Vor-Ort-Begehung ©  hochC Landschaftsarchitekten PartGmbB

1 / 4

Ideensammlung an der Tafel ©  hochC Landschaftsarchitekten PartGmbB

2 / 4

Ausschnitt der Ergebnisse ©  hochC Landschaftsarchitekten PartGmbB

3 / 4

In Gruppenarbeit sammelten die Schüler*innen gemeinsam Ideen, Wünsche und Vorschläge ©  hochC Landschaftsarchitekten PartGmbB

4 / 4

Vor-Ort-Begehung ©  hochC Landschaftsarchitekten PartGmbB

Ideensammlung an der Tafel ©  hochC Landschaftsarchitekten PartGmbB

Ausschnitt der Ergebnisse ©  hochC Landschaftsarchitekten PartGmbB

In Gruppenarbeit sammelten die Schüler*innen gemeinsam Ideen, Wünsche und Vorschläge ©  hochC Landschaftsarchitekten PartGmbB

Construction process

Beginn des Bauprozesses ©  hochC Landschaftsarchitekten PartGmbB

1 / 6

An ausreichend Fahrradständer ist gedacht ©  hochC Landschaftsarchitekten PartGmbB

2 / 6

Anlieferung der Sitzblöcke ©  hochC Landschaftsarchitekten PartGmbB

3 / 6

Während der Schulpausen gab es auf der Baustelle eine Vielzahl interessierter Zuschauer*innen ©  hochC Landschaftsarchitekten PartGmbB

4 / 6

Anlieferung der Robinienhölzer für die Spielgeräte ©  hochC Landschaftsarchitekten PartGmbB

5 / 6

Erhalt und Einbeziehung von Bestandselemente ©  hochC Landschaftsarchitekten PartGmbB

6 / 6

Beginn des Bauprozesses ©  hochC Landschaftsarchitekten PartGmbB

An ausreichend Fahrradständer ist gedacht ©  hochC Landschaftsarchitekten PartGmbB

Anlieferung der Sitzblöcke ©  hochC Landschaftsarchitekten PartGmbB

Während der Schulpausen gab es auf der Baustelle eine Vielzahl interessierter Zuschauer*innen ©  hochC Landschaftsarchitekten PartGmbB

Anlieferung der Robinienhölzer für die Spielgeräte ©  hochC Landschaftsarchitekten PartGmbB

Erhalt und Einbeziehung von Bestandselemente ©  hochC Landschaftsarchitekten PartGmbB

Drainage concept

The drainage of precipitation water for the property was redesigned. Previously, the rainwater was directed to the nearby Marderpfuhl, a drainless infiltration basin. Since the capacity of the infiltration basin has been reached for the most part due to the existing buildings already connected and the new construction of the sports hall, a more elaborate solution had to be found for the outdoor facilities. Some of the rainwater is channelled into the slightly lower green islands and infiltrated there. However, due to the unfavourable hydrological properties of the existing soil, the drainage of the schoolyard cannot take place exclusively via swales. The other precipitation occurring is reduced by materials capable of infiltration (paving with wide joints, gravel lawn, "green islands", water-permeable EPDM surfacing). The resulting excess runoff is collected in courtyard drains and gutters, pre-cleaned through filter shafts, and decentralized infiltrated in a large-scale infiltration trench below the schoolyard.

Rigole unterhalb des Schulhofes ©  hochC Landschaftsarchitekten PartGmbB

1 / 4

Entwässerung des Schulhofes mit Rinnen und versickerungsfähigen Oberflächen ©  hochC Landschaftsarchitekten PartGmbB

2 / 4

Abfluss über versickerungsfähige Oberflächen ©  hochC Landschaftsarchitekten PartGmbB

3 / 4

Versickerung des Regenwassers in die grünen Inseln ©  hochC Landschaftsarchitekten PartGmbB

4 / 4

Rigole unterhalb des Schulhofes ©  hochC Landschaftsarchitekten PartGmbB

Entwässerung des Schulhofes mit Rinnen und versickerungsfähigen Oberflächen ©  hochC Landschaftsarchitekten PartGmbB

Abfluss über versickerungsfähige Oberflächen ©  hochC Landschaftsarchitekten PartGmbB

Versickerung des Regenwassers in die grünen Inseln ©  hochC Landschaftsarchitekten PartGmbB

Fixed surfaces

The paved area of the schoolyard was designed with ARENA paving. This is
a rounded concrete block paving with a larger proportion of joints, with a high
percolation factor. The idea was to create an irregularly shaped paving, which follows the concept of the islands. In addition, the existing large stone, mosaic stone and concrete block paving was partially reinstalled in the area of the bicycle parking facilities, parking spaces, access routes and as edging for reasons of cost and sustainability.

Ensemble Bestand und Neubau ©  hochC Landschaftsarchitekten PartGmbB

1 / 4

Unterschiedliche Pflasterbeläge ©  hochC Landschaftsarchitekten PartGmbB

2 / 4

Auch das Pflaster nimmt das gestalterische Konzept der Insel auf ©  hochC Landschaftsarchitekten PartGmbB

3 / 4

Farbauswahl des Arena-Pflasters ©  hochC Landschaftsarchitekten PartGmbB

4 / 4

Ensemble Bestand und Neubau ©  hochC Landschaftsarchitekten PartGmbB

Unterschiedliche Pflasterbeläge ©  hochC Landschaftsarchitekten PartGmbB

Auch das Pflaster nimmt das gestalterische Konzept der Insel auf ©  hochC Landschaftsarchitekten PartGmbB

Farbauswahl des Arena-Pflasters ©  hochC Landschaftsarchitekten PartGmbB

back to overview
  1. Planning process
  2. Student Workshop
  3. Construction process
  4. Drainage concept
  5. Fixed surfaces