Blick über den Park © 2023 Nicolai Benner wbp-landschaftsarchitekten
Blick auf ehemaligen Sprungturm und Startblöcke © 2023 Nicolai Benner wbp-landschaftsarchitekten
ein „Geschichtsfenster“ zeigt noch den originalen Beckenrand © 2023 Nicolai Benner wbp-landschaftsarchitekten
© 2023 Nicolai Benner wbp-landschaftsarchitekten
auch die Freibaduhr hat im Original überlebt © 2023 Nicolai Benner wbp-landschaftsarchitekten
Zustand des Freibads Lübbecke im Jahr 2018 © 2018 Stadt Lübbecke wbp-landschaftsarchitekten
The outdoor pool on Obernfelder Allee is located in the south-west of the town of Lübbecke and is surrounded by residential buildings and development areas, sports facilities and open farmland. To the south, there is a restaurant/hotel and, a little further on, a hospital in the transition to the adjacent forest. The open-air swimming pool, built in 1953, was closed in 2002, the buildings were placed under a preservation order and the facilities fell into disrepair.
Key idea
- Preservation of key elements of the former outdoor pool such as diving tower, swimming pool, paddling pool, old trees and existing topography
- Creation of a multi-generation and exercise park
- Intensive integration of citizens' wishes
Monument ensemble
- The former swimming pool was laid out as a grass field for events
- The diving tower was renovated in line with the design language of the 1950s so that the 5m level can be used as a viewing terrace; access to the 10m tower was closed
- Starting blocks, an old wall formation, an old clock tower and the access pool were integrated or reinterpreted in terms of design
- The paddling pool was turned into a water and sand play area and supplemented with lots of play equipment
Zoning
-the central swimming pool remains the central element of the park
- A circular path was created around it with offers for different age groups and activities; play and exercise offers for a large category A play area with offers for different age groups and also for citizens with restricted mobility were realized. There are fitness and pub facilities
- the grassy areas under the trees are well used on hot days
-while the northern park area has a high density of facilities, the southern park area is characterized by ponds and old trees for quiet relaxation and enjoyment of nature
- the changing rooms were not part of the planning
Materiality
-Materials and equipment are subject to a calm and robust design
- The park entrances are emphasized by means of access joints with seating.
Read more +
Planning offices
wbp landscape architects GmbH
Bochum
Employees
Anneli Heynen
Project period
2018
- 2022
Size
13.200 qm
Construction amount
2,21 Mio Euro
Client
Stadt Lübbecke
Address
Bürgerpark, Obernfelder Allee 31
32312 Lübbecke
Deutschland
Show project location on map
Project type
Urban, open space development concepts
Parks and green spaces