Playground Sebnitzer Straße in Dresden Playground of the waterways

Entwurfsplan Umgestaltung © 2021 LA21 I Dresden M. Brod-Kilian

1 / 9

Betonfläche mit Bodenmosaiken vor der Eröffnung im Jahr 2001 © 2002 Marion Brod-Kilian

2 / 9

Bodenmosaik aus Fliesen und Fliesenmosaike der Einfassung © 2003 Marion Brod-Kilian

3 / 9

Schaukelnest bzw. "Wunderblume", 2003 mit Sohn der Planerin © 2003 Marion Brod-Kilian

4 / 9

Wellenbank mit Fischskulptur © 2023 M. Brod-Kilian

5 / 9

Blick auf Fischerhütte und Holzsteg, im Hintergrund von Kindern gestaltete Wand © 2023 M. Brod-Kilian

6 / 9

© 

7 / 9

Neu befestigter Wasserspielhügel mit Aufstieg © 2023 M. Brod-Kilian

8 / 9

© 

9 / 9

Entwurfsplan Umgestaltung © 2021 LA21 I Dresden M. Brod-Kilian

Betonfläche mit Bodenmosaiken vor der Eröffnung im Jahr 2001 © 2002 Marion Brod-Kilian

Bodenmosaik aus Fliesen und Fliesenmosaike der Einfassung © 2003 Marion Brod-Kilian

Schaukelnest bzw. "Wunderblume", 2003 mit Sohn der Planerin © 2003 Marion Brod-Kilian

Wellenbank mit Fischskulptur © 2023 M. Brod-Kilian

Blick auf Fischerhütte und Holzsteg, im Hintergrund von Kindern gestaltete Wand © 2023 M. Brod-Kilian

© 

Neu befestigter Wasserspielhügel mit Aufstieg © 2023 M. Brod-Kilian

© 

Redesign of a dilapidated playground in a gap in the Gründerzeit district of Dresden-Neustadt. The project was carried out in cooperation with a local residents' initiative.
A robust facility with a variety of play activities was created on a limited area, which also functions as a meeting place for young and adult residents.
Under the theme of "waterways", the only still functioning element of the former facility, a groundwater pump on a hill, was incorporated. Waves of blue and turquoise tile mosaic were created for the stele surround and concrete floor, a rocking boat, the "miracle flowers," feather baskets in the sand, a bamboo grove, and most importantly, a water feature made of mosaic pavers with weirs and a water spiral.

Elements:
- Concrete surface with stylized water surfaces made of quarry mosaic
- Wave-shaped enclosure made of concrete steles with inlaid tile mosaic
- Rock island
- Rocking boat
- Sand islands with bobbing "wonder flowers"
- Fortified play hill with slide and water play facility
- Bamboo thicket
- Bleachers.

Read more +

Planning offices

LA21 Landscape Architecture Dresden
Dresden

Employees
Marion Brod-Kilian

Project period
2000 - 2002

Size
750 m²

Construction amount
ca. 45.000

Client
Landeshauptstadt Dresden
Grünflächenamt

Address
Sebnitzer Straße 24
01099 Dresden

Show project location on map