Balancier- und Kletterstruktur © 2023 A. Scheunert
Vogelnestschaukel mit Blick auf Rollerstrecke und Rutschenhügel © 2023 A. Scheunert
Balancier- und Kletterstruktur Hofbereich © 2023 A. Scheunert
Rollerstrecke © 2023 A. Scheunert
Bolzplatz mit Kunstrasen und denkmalgerechter Einfriedung © 2023 A. Scheunert
Sandspielbereich an der Terrasse Hofseite © 2023 A. Scheunert
Balancierstrecke am Hang, Hofseite © 2023 A. Scheunert
Blick auf Sand- und Wasserspielbereich Straßenseite © 2023 A. Scheunert
Spielhügel mit Stelzenaufstieg, Straßenseite © 2023 A. Scheunert
Motoriktreppe am Spielhügel Straßenseite © 2021 Marion Brod-Kilian
Beschatteter Wasser-Matsch-Bereich Hofseite © 2023 A. Scheunert
Redesign of the street-side play area according to the pedagogical concept, connection with the play areas on the courtyard side (planned by LA21 and realized in 2015) and various functional areas, including existing equipment.
A continuous roller track made of light-colored asphalt connects the play area on the courtyard side with the new ribbon-shaped play area sequences and ends at the entrance area. Cobblestone thresholds provide the necessary speed reduction in the area of danger spots. A wide variety of play and exercise options are lined up along this path, such as the shady balancing route between shrubs, the sandstone climbing rock, the bird's nest swing, the play hill with various steps and crawl tubes (some of which are from the old stock) as well as a versatile water-sludge-sand construction site and a playing field with an artificial turf surface.
The separating effect of the elevated connecting building disappears with the help of a new staircase with a wide slide, which connects the kindergarten groups.
These offerings form a framework that can be expanded and modified with flexible and mobile additions such as the movement construction site, slackline, ropes and hammock. Existing large trees are carefully integrated, hiding places are made accessible, views are made possible and free spaces are left open for creative appropriation and design.
Read more +
Planning offices
LA21 Landscape Architecture Dresden
Dresden
Employees
Marion Brod-Kilian
Annett Quaß
Lara Homann
Project period
2019
- 2021
Size
1.100 m²
Client
Landeshauptstadt Dresden
STESAD GmbH
Königsbrücker Straße 17
01099 Dresden
Address
Mendelssohnallee 27/29
01309 Dresden
Show project location on map
Project type
Playgrounds, e.g. at childcare centers and schools