Components of the new school sports facility include a 100 m running track with two lanes, a long jump facility with two run-up lanes and a shot put facility. These elements fit into the terraced terrain and can therefore be used simultaneously.
The challenge here was the highly undulating terrain and the premise of minimizing earth movement.
The flatter slopes are secured with trees and shrubs, while the rest are reinforced using ground covers and erosion control mats, sometimes combined with retaining walls.
The former school garden shed will be used as a storage area for mobile sports equipment in future and will be connected to the starting area of the running track, long jump and shot put facility via a rustic, near-natural gravel path and wooden steps.
When arranging the sports facilities, care was taken to preserve the trees and shrubs as far as possible.
Read more +
Planning offices
LA21 Landscape Architecture Dresden
Dresden
Employees
Marion Brod-Kilian
Annett Quaß
Lara Homann
Lydia Scheidereit (extern)
Other planning stakeholders
Ausführung:
LLB Garten- und Landschaftsbau
Project period
2020
- 2022
Size
3.300 m²
Construction amount
250.000
Client
Stadt Bad Gottleuba-Berggießhübel
Bauverwaltung
Königstraße 5
01816 Bad Gottleuba-Berggießhübel
Address
Hellendorfer Straße 32
01816 Bad Gottleuba-Berggießhübel
Show project location on map
Project type
Playgrounds, e.g. at childcare centers and schools
Sports facilities