Vaterstetten station square - water architecture Traffic-calmed area - square design

Wasserkaskade entlang Parkhaus © 2010 Reitsam

1 / 8

Brunnen Platz © 2012 Reitsam

2 / 8

Wassermauer an Rampe © 2009 Reitsam

3 / 8

Springende Mädchen © 2009 Schülerin Reitsam

4 / 8

Wasserschleier am Brunnen © 2010 Reitsam

5 / 8

Grüne Säulen © 2011 Reitsam

6 / 8

Wasserfall Parkhaus © 2010 Reitsam

7 / 8

Bahnhofsplatz Vaterstetten - Wasserarchitektur © 2006 Reitsam

8 / 8

Wasserkaskade entlang Parkhaus © 2010 Reitsam

Brunnen Platz © 2012 Reitsam

Wassermauer an Rampe © 2009 Reitsam

Springende Mädchen © 2009 Schülerin Reitsam

Wasserschleier am Brunnen © 2010 Reitsam

Grüne Säulen © 2011 Reitsam

Wasserfall Parkhaus © 2010 Reitsam

Bahnhofsplatz Vaterstetten - Wasserarchitektur © 2006 Reitsam

A 47 m long "water architecture" picks up on the historical axis from the station square to the old town center. Cool groundwater gushes out of the fountain, running down green walls, cascades and basins. Finally, it plunges back into the underground stream of the gravel plain via a waterfall. Vaterstetten gives a refreshing welcome: "Green connects - gravel, water, parks"!



The old station square and the ramp to the S-Bahn station have been transformed into a prestigious calling card for the town of Vaterstetten.

The traffic-calmed square, which previously presented itself as an asphalted bus turning circle at the new multi-storey parking lot, has been upgraded with seating walls and level paving with concrete and natural stone. The shopping areas and the area around the multi-storey parking lot with its café have become a meeting place for young and old.

Read more +

Downloads

Projektbeschreibung

Planning offices

reitsam landscape architecture urban planning bdla
Freising

Employees
Mitarbeit: Dipl.-Ing. (FH) Sabine Voß, Dipl.-Ing. Helmut Leuker / Freising

Further planners involved
Geologie: Ingenieurbüro Dr. Knorr GmbH, München Sanitär: IpV Ingenieurgesellschaft GbR, München, Elektro: Stelzl Consulting, Vaterstetten

Project period
2006 - 2013

Size
1200 qm

Construction amount
500.000 €

Client
Gemeinde Vaterstetten, Tiefbauamt

Address
Bahnhofsplatz S-Bahnhof Vaterstetten
85591 Vaterstetten
Deutschland

Show project location on map

Project type
Squares, promenades, pedestrian areas
Green concepts for residential, commercial and industrial areas
Control of construction processes, cost and schedule control
Public participation / moderation