Grüner Wall / Green City - greening planning Measures to reduce the urban climatic stress situation in the city center caused by climate change

© Kienleplan

1 / 8

Kategorien © Kienleplan

2 / 8

Maßnahmen © Kienleplan

3 / 8

Klimatische Entwicklung und Maßnahmen - Hansaplatz © Kienleplan

4 / 8

Maßnahmensteckbrief - Quartierstraße © Kienleplan

5 / 8

Maßnahmensteckbrief - Dachgrün/ Fassaden © Kienleplan

6 / 8

Beispiel Dach- und Fassadenbegrünung - Kampstraße © Kienleplan

7 / 8

Beispiel Technischer Sonnenschutz - Hansaplatz © Kienleplan

8 / 8

© Kienleplan

Kategorien © Kienleplan

Maßnahmen © Kienleplan

Klimatische Entwicklung und Maßnahmen - Hansaplatz © Kienleplan

Maßnahmensteckbrief - Quartierstraße © Kienleplan

Maßnahmensteckbrief - Dachgrün/ Fassaden © Kienleplan

Beispiel Dach- und Fassadenbegrünung - Kampstraße © Kienleplan

Beispiel Technischer Sonnenschutz - Hansaplatz © Kienleplan

Like many other highly urbanized areas, Dortmund's city center is characterized by dense development structures with a high degree of sealing, which leads to the formation of an urban heat island. Particularly in city districts that are classified as inner-city climatopes, there is a need for comprehensive action to reduce the heat load. For this reason, a greening concept with concrete measures is to be developed for the City im Wall and Wallring. The aim of the project is to reduce the future increasing heat pollution in the Dortmund city center and to increase the quality of stay by significantly increasing the amount of green space in the city center area and along the Wall.

- Creation of a microclimatic simulation of the existing
- Evaluation of the climarelvanz of green spaces in the project area
- Location of climate-appropriate greening potential
- Climatic simulations for plan scenarios
- Review and evaluation of the climate relevance of the measures based on a comparison with the existing situation
- Derived from the simulation calculations, framework conditions and an implementation strategy are formulated, fields of action are named and action profiles are developed.

Read more +

Planning offices

Kienleplan GmbH
Leinfelden-Echterdingen

Employees
Kienleplan:
Christiane Meßner
Dijana Radojevic

Lohmeyer GmbH:
Georg Ludes
Jessica Lehmkühler
Patrick Hogan

Other planning stakeholders
Klimaanalyse und Simulation:

Lohmeyer GmbH
Niederlassung Bochum

Project period
2021

Size
Innenstadt Dortmund

Client
Stadt Dortmund

Project type
Concepts for climate adaptation and climate protection