Renaturation of the Kyll estuary Joint compensation for various infrastructure projects

Mündungungsbereich im August 2008 unmittelbar vor dem Baubeginn © 2008 Bernhard Heller BGHplan

1 / 9

Erstes Hochwasser während der Baumaßnahmen im Dezember 2008 © 2008 BGHplan

2 / 9

Juli 2009 - sechs Monate nach Abschluss der Baumaßnahmen © 2009 Bernhard Heller BGHplan

3 / 9

Mündungsbereich mit deutlich sichtbaren Altarmen © Bernhard Heller BGHplan

4 / 9

Altarm im Sommer 2010 © 2010 Dirk Uebele Uebele Fotodesign

5 / 9

Mündungsbereich im August 2010 © 2010 Bernhard Heller BGHplan

6 / 9

Herbst in der Aue © Bernhard Heller BGHplan

7 / 9

Der Mündungsbereich im Wandel der Zeit vor der Renaturierung © GeoBasis-DE/LVermGeoRP2013-01-14 http://www.lvermgeo.rlp.de

8 / 9

Die Kyllmündung um 1940 © 1940 unbekannt BGHplan

9 / 9

Mündungungsbereich im August 2008 unmittelbar vor dem Baubeginn © 2008 Bernhard Heller BGHplan

Erstes Hochwasser während der Baumaßnahmen im Dezember 2008 © 2008 BGHplan

Juli 2009 - sechs Monate nach Abschluss der Baumaßnahmen © 2009 Bernhard Heller BGHplan

Mündungsbereich mit deutlich sichtbaren Altarmen © Bernhard Heller BGHplan

Altarm im Sommer 2010 © 2010 Dirk Uebele Uebele Fotodesign

Mündungsbereich im August 2010 © 2010 Bernhard Heller BGHplan

Herbst in der Aue © Bernhard Heller BGHplan

Der Mündungsbereich im Wandel der Zeit vor der Renaturierung © GeoBasis-DE/LVermGeoRP2013-01-14 http://www.lvermgeo.rlp.de

Die Kyllmündung um 1940 © 1940 unbekannt BGHplan

In the 1950s, the meandering course of the Kyll in the estuary area near Trier was straightened and the banks fortified, the oxbow lakes with alluvial forest were separated from the course and partially filled in or silted up as they were no longer crossed during floods. The areas between the oxbow lakes were used for agriculture.

However, the estuary area of the Kyll offers ideal conditions for renaturation as it is located outside of residential areas. The aim of the 35-hectare renaturation project is to further develop the estuary area following a one-off intervention in the autumn and winter of 2008/2009. This involved connecting the oxbow lakes to the watercourses and making them passable, creating a variety of transitional areas between the watercourse and the land and abandoning agriculture in the entire estuary area to develop riparian forests. The measure enabled the joint implementation of nature conservation and water management compensation obligations from four different infrastructure projects.

Read more +

Planning offices

BGHplan Environmental Planning and Landscape Architecture GmbH
Trier

Size
35 ha

Client
Zweckverband Wirtschaftsförderung Trierer Tal
Landesbetrieb Mobilität Trier

Show project location on map